Simple Boxing in

Filed Under: Do it yourself, Home repair, Plumbing, Remodeling    by: ITC

For many people a simple boxing-in of their existing pipes to keep them out of sight is all that they require. This is a straightforward task and the materials are easily available.

You’ll need softwood battens, usually 50x25mm (2×1 in), with a cladding of hardboard or 3mm plywood for the simplest job. Before you go ahead. however. you should check whether any hot water passes through the pipes to be hidden.

If this is the case and you’re using hardboard for your cladding, you’ll have to condition it first Of it will warp as the heat in the pipework dries it out. This is riot a difficult technique: all youl have to do is brush water onto the reverse (mesh) side and leave it flat for 48 hours in the room where it is to be fixed. The softwood battens should also be left lying flat in the room for a few days so that they. too. w adjust to the moisture content of the air.

If the wood has been conditioned, the two battens should be screwed to the wall on each side of the pipes and the cladding attached to the battens.

Fixing battens edge-on to the wall is not always the perfect answer but by doing so you’ll be able to cover adequately a few pipes that project up to 25mm (1 in) or so from the wall, and the cladding will, in any case, hold the battens steady.

Remember that you should never use glue to fix the cladding to the battens because you might need access to the pipes for repairs or modification at some stage in the future. Pins punched in at 150mm (6in) centres, with their heads covered with filler, should prove adequate; this way the cladding can be prised off if necessary.

Boxing in pipes running in a corner will require two 25mm (1 in) battens which have been chamfered at the front to provide an angled edge. These are screwed to the two walls and the cladding, also with chamfered edges, is then fixed to the battens. For larger pipes you’ll need just a single larger batten fixed to one of the smaller ones; the cladding will be pinned to this and the smaller batten.

Another method is to use a spring clip attached to a piece of 19mm (s/ain) thick timber. Its edges should be planed and chamfered to allow it to fit neatly into the corner, and the spring clip is then fixed to the pipe itself.

If the pipes are in the alcove of a chimney breast you can box them in and then finish off the boxing so that it looks like an extension of the existing wall (see Ready Reference). The boxing for horizontal pipes down near the floor can often be made to look like wide and deep skirting.

A 25mm (1 in) batten should be fixed to the floor itself and one should also run above, but parallel to, the pipe. To the upper batten an additional 50x25mm (2×1 in) batten should be fixed; the cladding is then attached to this and the batten on the floor.

Sealing Round A Bath

Filed Under: Bathroom, Do it yourself, Home repair    by: ITC

One of the commonest problems associated with baths, shower trays and wash basins is the difficulty of sealing the gap between the edges and the walls. It is extremely important that this is done effectively as, apart from being an unsightly dirt trap, water continually splashing through the gap can lead to attacks of rot in floor timbers, as well as damaging decorations in the room below.

An ordinary cellulose filler will be adequate, but you’ll probably find that it won’t last for very long. After all, repeated soakings are bound to start it crumbling. And even if this can be avoided, the chances are that the movement of the bath relative to the wall — as it fills with hot water or as someone climbs in or out — will have the same result.

The answer is to use a special kind of filler, one that is both waterproof and flexible. called silicone mastic. This is frequently sold as bathroom sealant in small tubes, or, for larger jobs, in cartridges that fit into a special mastic gun. In addition to white. it is available in a selection of colors to match the variety of colored bathroom suites now on the market.

If you are faced by a crack up to 3mm (‘/sin) wide, then filling it is a straightforward job. All you do is squeeze a bead of mastic along the gap, holding the nozzle at an angle of about 45′. If you are using a cartridge gun: you can cut the nozzle to produce a bead of the correct size. If the mastic ends up on surfaces where it’s not required, wipe it off with a damp cloth before it sets. With the bead in place you’ll have to finish it off with a piece of dowel or narrow piping. Dip it in water to prevent the mastic from sticking and don’t be tempted to use your fingers — you won’t get as neat a finish and you could run the risk of inadvertently getting mastic in your eyes.

However, if the gap is wider than 3mm (1/sin) or so, you’ll find it increasingly difficult to apply the bead smoothly and neatly, and to prevent it sagging once in place. The solution is to caulk the gap before applying the mastic. This involves filling the crack with soft rope or twists of soaked newspaper to provide a base that will help the mastic to bridge the gap until it sets. Provided you finish off with a good covering of mastic, there’s no reason why this shouldn’t last. However, it is a fiddly job and you might prefer to use an alternative method.

Screening a solid floor

Filed Under: Do it yourself, Home repair, Remodeling    by: ITC

Screening your floor gives vital protection to a new layer of damp proofing and is an essential preparation before replacing floor covering.

It can be done in two ways. If the unevenness is slight, or you want to cover the existing flooring without lifting it, the best method to use is a self-leveling flooring compound. Make sure your floor is clean, dry and dust-free. If it is at all dusty, you should treat it with a proprietary concrete sealer before applying the flooring compound.

Mix the compound with water until it has a creamy consistency, and then pours enough on the floor to cover an area just under 1 sq m (1sq yd). Using a steel float smooth it out so that nowhere is the layer thicker than 3mm (Vain).

Then move onto the next square. Remembering that the compound will level itself out, so removing float marks and producing an acceptable finish. Leave it for a week or longer before laying the flooring. A second application, to smooth out slight lumps and bumps, can be applied after two or three days, but no more than three coats should be used otherwise there will be a risk of cracking at a later date.

The second method of leveling, using a mortar screed, is slightly more arduous but it does give the damp-proof membrane greater protection. Working from the far end of the room towards the door, divide the flood into strips about 1m (3ft) wide using 50 25rnrn (2 x line) softwood battens, and use more battens around the walls. Make sure that they are level with a spirit level, and if they aren’t, pack them out with scrap wood.

It is vital that you get all the battens level because they serve to guide you when you start laying the screed. If you don’t have them level, then your screed won’t be true and that’ll cause more problems when you come to lay the final surface. Cover the floor. a section at a time, with a 1:3 cement to sharp sand mortar, mixed with the minimum of water to the consistency of brown sugar_ Using a stiff board, scrape jt level with the battens and tamp it slightly as you go, using a steel float to give it a smooth finish.

To get the best finish to your screed keep the blade damp to stop the surface from dragging, but don’t make it too wet. When you complete each section remove the guide batten furthest from you and fill in the resulting channel before tackling the next section.

If you lay a screed during a warm dry spell it’s advisable to lay a plastic sheet over it for at least three days. This stops the mortar drying out too quickly and lets it cure properly. Even in milder weather it’s still best to sprinkle water gently over it twice a day for a few days. If the mortar dries out too quickly it will be below strength and will probably crack as it dries. Finally make good the walls and replace the skirting.

The big drawback with this method is that it raises the level of the floor by 25mm (1 in). Strictly speaking you should dig out the existing floor to the required level before starting, but this carries the risk of damaging any existing damp-proof membrane. One way of accommodating the extra thickness is to trim the bottom of the doors and build up any existing external doorsteps.

Do make sure that you don’t reduce the floor/ceiling height below the Building Regulations minimum of 2.3m (7ft 6in) and remember to do something about the change in level at the door thresholds: a shallow ramp is better than a shallow step.

There is another option, and that is not to lay a membrane at all. Instead you select flooring that can be laid using cement-based flooring adhesive. The former lets the damp through. so you should choose material that won’t be harmed by it, and the latter acts as a sort of damp-proof membrane itself.

But. as it is a makeshift solution. it will not always work and there is nothing to stop the damp rising through the walls. The floor will therefore be attacked from the edges. which can be just as harmful and the result will be that the whole floor will eventually have to be replaced, not only giving you extra work but also further expense.

Reglazing a Window

Filed Under: DIY Outdoor, Do it yourself, Home repair, Remodeling    by: ITC

First you must line the rebate with putty. You can either take a ball of putty in the palm of your hand and squeeze it out between thumb and forefinger using your thumb to press it in; or you can roll the putty into finger- thick sausages and press these into place. Wet your hands before handling putty to prevent it sticking to your fingers. and knead it until it is pliable and any surface oils are thoroughly mixed in.

Next, press the pane into the puttied rebate with the palms of your hands, so that putty oozes out, around and behind the glass. Apply pressure around the edges rather than in the centre of the pane and check that, when you’ve finished. the glass is separated from the frame on the inside by a bed of putty which is 2mm to 3mm (up to ‘Vain) thick.

Now for the unnerving part — nailing the glass in place. It’s best to use glazing sprigs, but you could make do with 19mm (3/4in) panel pins that have had their heads nipped off with pliers. You’ll need at least two per side, spaced no more than 230mm (9in) apart, and you must be sure to drive them squarely into the wood so they don’t pinch and crack the glass. When you’ve finished, just over 6mm (1/4in) of pin should be showing.

The final stage is to fill the rest of the rebate with a triangular fillet of putty that neatly covers the pins. Apply the putty in the same way as when lining the rebate, and use a putty knife or an ordinary filling knife to do the shaping, mitring the corners of the fillet as neatly as possible. Wet the knife blade to prevent the putty sticking to it as you draw it over the fillet.

Clean off the excess putty — including any that oozed out inside the pane earlier — and allow to dry hard before painting.

When you need to reglaze a window that isn’t at ground level, you’ll have to jerk from a ladder. Obviously you’ll have to be organized when working at a height. Tap out most of the glass first from inside — and make sure there’s no one standing below as you do so. Put all the tools and equipment in a bucket which you can hang on a hook attached to the ladder at the top. Don’t try to carry the glass — it’s best to get someone to pass it through the window.