Do It Yourself Sunrooms

Filed Under: DIY Outdoor, Do it yourself, Remodeling    by: ITC

Have you ever wished that you could have a sunroom in your home and just did not want to hire a contractor to get the job done? Well this is no longer the case. You now have a variety of different options that are available to you that will allow you to build your dream sunroom and you will not even have to hire that expensive contractor. You can even have a whole sunroom including the essential elements delivered right to your door step. The main idea behind these great kits is the ability to save you money while you getting that dream room.

This is an excellent idea to help you cut the costs on the overall project if you happen to have a fairly limited budget. This is due to the fact that you will not only save on the labor costs because you will be doing it yourself but also because you are completely cutting out the middle man. Possibly the best cost savings would be having it delivered directly from the manufacturer you save on the total cost of the supplies that will need. Another great advantage in doing yourself sunroom kits is that you have the ability to order an energy efficient kit that will also save you money on your overall electrical bill as well as maintenance costs over time. With today’s economy this can be an excellent benefit.

One of the important things that you need to be aware of however is that the cost of your sunroom kit will vary according to both the requirements that you may have and the overall condition of your home. If you are simply looking into building a simple sunroom on an existing cement block or deck then you will be spending less costly than it would be when you have to build a foundation as well.

If you are one of the luckier ones to have an existing concrete block it is an ideal place to install your dream sunroom. The concrete blocks are one of the best places because it is already prepared for construction and you will not have to do anything extra to it. However if you are not lucky enough to have a cement block you will need to do some careful research on the best possible place that you can place your sunroom. Also it is important that you prepare that area before you lay the beginning foundation to prevent cracks. This will increase the overall time that you will need to plan in the construction phase but it will be well worth it in the end.

As you can see there are a variety of different options available to you when you plan your dream sunroom. The more careful consideration that you do in the beginning will save you time and money in the end.

Constructing a Blockwork Wall

Filed Under: Do it yourself, Home repair, Remodeling    by: ITC

Although a wood-framed partition is easy to build, it does not provide the most effective sound insulation and it will need extra strengthening if it is to carry shelves or cabinets. In situations such as this, a partition built from lightweight concrete blocks is much more suitable. However, you cannot build such a partition on an upper floor, since even a reinforced concrete floor is unlikely to be strong enough to carry the load of a concrete block partition. A concrete first floor makes an ideal foundation and even a suspended wood first floor will do if a full-width wood sole plate is put down first, but check with your local Code.

Before starting work, the floor, walls and ceiling should be stripped of all coverings and any coving and base cut away with a chisel to clear the blocks. The easiest way to mark the position of the partition is

with a chalked plumbline, snapping it against the floor to leave two parallel chalk lines the width of the blocks. Continue these lines up the walls and across the ceiling making sure they are vertical.

For strength, it is best to tie the partition to adjacent walls by cutting recesses in them to accept the end blocks of alternate courses or similarly by using galvanized metal ties screwed to the walls and buried in the blockwork mortar joints. Nailing a guide batten to the wall against one of the chalk lines is also a good idea to help with the alignment.

Trowel a 6in wide layer of mortar (1 part masonry cement: 6 parts soft sand) across the floor to span the chalk lines on it, leveling it out to about 1/2 an inch thick. Then scribe a guide line through the mortar in line with the chalk marks on the end walls, using the point of your trowel and a long straight-edged plank.

There are many different types of concrete block to choose from, but the best types for building an internal partition are known as aerated blocks (A).

These are light in weight, so they are easy to handle — an important quality since they are twice the size of a normal brick. This fact also means that you can build a full-height partition relatively quickly. You can drill them, knock nails into them or, using a general-purpose saw, cut channels in them (B) to conceal electric cables and pipe work. Sound will not pass through them as easily as it would a woodframed partition, nor will heat.

Aerated blocks should be laid in the same manner as bricks in a “stretcher” bond pattern with mortar joints. Their normal size is 17 x 81/2 x 4in. For finishing, you can either plaster them directly or nail on battens and fix a gypsum board cladding to the battens.

Masonry Repairs

Filed Under: DIY Outdoor, Do it yourself, Home repair, Outdoor    by: ITC

Basic masonry repairs include:

  • Filling in dings in floors and driveways
  • Replacing a block or brick
  • Repointing mortar

To patch concrete first remove all loose material from the old concrete. Use a vacuum cleaner. Then scrub away any oil or grease with hot water and trisodium phosphate (TSP). Use a stiff brush. Protect your hands with rubber gloves.

After the concrete is clean, wet it. Fill in the patch. The best mix for patching concrete is one part Portland cement to three parts fine, clean sand. Add concrete glue to help feather out the edges of your patch and secure it to the old concrete. Leave a wet rag or gunny sack over the patch for a couple days.

Replace a broken or missing concrete block with the same mix. Chisel the old mortar away. Soak the new block in water for five minutes and wet the blocks around the hole. Trowel in mortar on all sides and set in the new block. You may have to take some mortar out little by little to make the block fit. Keep nudging the block with your trowel handle or a piece of wood. Don’t use a hammer.

Once the block is in place and aligned, tool the joint to match the rest of the wall. If the other joints are tuckpointed (grooved) make the new joint match. Wipe up any mortar spilled on the face of the block before it hardens.

Use a finishing tool to finish mortar joints after the mortar begins to harden.

When you replace a brick or block, trowel in mortar around the opening. Nudge the block in place with the handle of a trowel or a piece of wood.

To patch concrete, clean and wet the area. Fill in the area and feather the edges so the patch will stick.

Replacing a fired (red) brick is the same as a concrete block. But be very careful to match the color or your replacement will stand out..

Try not to spill mortar over the face of the brick. If you do, you can remove the stain with acid and a stiff brush. BE CAREFUL WHEN WORKING WITH ACID. Always add the acid to water. Adding water to acid can cause an explosion. Protect yourself with goggles and rubber gloves. Wear old clothing. Muriatic acid will remove clothes, eyes, and skin faster than it will remove the mortar stain.

Repointing is putting new mortar into joints when the old mortar is falling out. First clean out the crumbling mortar. You can make a tool for this by nailing through a block of wood until the point of the nail extends 1/2 inch. Slide this point along the joints and you won’t dig too deep. Then wet the bricks and flush out loose mortar with a good strong hose jet.

Mix no more mortar than you can use in one hour. If you are repointing a whole wall or chimney, use any color mortar. However, if you are patching only a section, take care to match the color of the old mortar. Don’t work with mortar when the temperature is below freezing.

You can make a tool to remove old mortar by driving a nail through a block of wood until it extends about 1/2 inch.

About Us | Contact Us | Privacy Policy | Site Map
©2004-2011 Indy Total Construction