Covering Roof with Asphalt

Filed Under: DIY Outdoor, Do it yourself, Home repair    by: ITC

The method used for constructing a flat roof is outlined in the following way; the joists usually being laid along the length of the extension from the house to the end wall. At the house end, the joists may either rest on top of a wooden wall plate, being toe-nailed in place, or be nailed to metal hangers which are also nailed to the wall plate. The ends of the wall plate are set in sockets built into the extension side walls.

At the end of the extension, the joists can simply rest on top of the end wall and be nailed in place or, if there is a window in the end wall, a second wooden beam can be fitted to span the opening and support the joists.

Tapered furring pieces are nailed to the tops of the joists to create the right fall. For felt covering the fall should be 1 in 60, but for asphalt it should be 1 in 80.

Sheets of exterior grade plywood are used to provide a roof decking and are nailed down through the furring pieces into the joists. The sheets should be staggered so the joints between their short edges do not coincide.

Although a felt-covered roof is the cheapest and easiest to construct, a much more durable finish can be obtained by having it covered with asphalt. This material is heated until it melts and is then spread over the roof to provide a solid, impervious layer when it cools. It is a job that requires a great deal of skill and is one that you should get a building, contractor to do for you.

Flat roofs can often suffer from condensation when moist air passes through the ceiling from the rooms below and cools on contact with the underside of the roof — particularly with bathrooms and kitchens and when the atmosphere is damp.

Leaving ventilation gaps behind the fascia and insulating the roof will help, but the best idea is to either use foil-back gN,:psumboard for the ceiling – which will stop the moist air passing through – or staple a separate polyethelene vapor barrier to the underside of the joists before nailing the gypsum- board in place. Once the extension has been weatherproofed by glazing the windows and fitting the doors, the room can be finished. Before plastering the walls and ceiling, lay in the necessary electrical cables, mount accessory boxes and run in any pipe work for hot and cold water or central heating.

Directions

1 Nailing the roof joists into hangers attached to the main beam; toe-nail through the top of the roof joists into the main beam also.

2 Nailing furring pieces (narrow end over the front wall) to the tops of the roof joists to set a 1 in 80 fall for the roof

3 Nailing the plywood roofing sheets over the furrings: stagger the joints between the short edges.

4 After pouring hot asphalt onto the roof. smoothing it out to a layer about 3/8in thick.

Banisters

Filed Under: Do it yourself, Home repair, Remodeling    by: ITC

Of all the sections of the staircase likely to suffer damage, the handrails come top of the list. Yet they play an important safety role by preventing people from falling down the stairs and so must be kept in good repair.

The balusters are the most vulnerable part of the assembly and may become loose or broken.

A loose toe-nailed baluster can be tapped free with a mallet and block of wood, the nails removed and the holes opened out with a drill to accept countersunk screws. Then glue and screw it in place.

If the ends of the baluster are held by mortise joints, you can stop the baluster rattling about by driving narrow wedges into the gaps around the ends, having first smeared them with glue. Cut the ends of the wedges flush with the surface of the string or handrail as appropriate. Sometimes, the balusters are held by thin strips of wood nailed in place between the ends of adjacent balusters. In this case, carefully prise off the strips on each side of the loose baluster and replace them with slightly longer ones.

If the baluster is actually broken, you can either replace it with a new one (assuming you can get one to match) or glue it back together, reinforcing the joint with dowels or screws. Toe-nailed balusters are easily removed as described above, as are those held by nailed-on capping pieces. However, if they are mortised into the string and handrail, you may have to saw through the ends to remove the baluster. Then glue blocks of wood into the mortise, plane them flush, cut the new baluster to fit and glue and screw it in place as you would a skewnailed version.

If a section of handrail is broken, you can make a simple repair by screwing a metal plate underneath across the break. Alternatively, you- can cut out a section and fit a new piece, using special handrail bolts or screws.

These need matching holes in the ends of the old and new rail, and the easiest way of marking them is with a paper template that matches the profile of the rail with the hole center marked on it. Hold the template over the end of each piece and mark the hole center by punching through with a nail. Additional holes must be drilled or cut with a chisel into the underside of the rail so that the nuts securing the bolt can be tightened.

Newel posts are unlikely to break, but if they do, they must be replaced completely. To remove it, you will have to lift the adjacent floorboards and unbolt the base from the joists. Then drive out the dowels holding the handrail and string to it. Finally, tap the newel post free — it may help to cut it into sections with a saw.

Use the old post as a guide for marking out the new one, making sure the mortises and dowel holes are all positioned correctly. Treat the base of the post with preservative and refit it, gluing the string and handrail in place and reinforcing the joints with fresh dowels.

Whether you are installing a new staircase or simply repairing an existing one, the range of components available in kit form makes the task much easier.

The stairs may be ready-assembled and consist of 12 or 14 treads for a full flight or six treads for a half-flight; they are available with or without risers (for closed or open tread styles) and bullnose steps allow extra versatility at floor-level.

The newels, baluster spindles, rails and fittings are manufactured in a wide variety of styles, from traditional to contemporary. The timber, which includes mahogany and hemlock, is usually sanded ready for varnishing or staining.

Repairing an Old Ceiling

Filed Under: Do it yourself, Home repair, Remodeling    by: ITC

There are two types of ceiling construction, depending on their age. Early ceilings were made by nailing thin strips of wood (laths) to the joists so that there were narrow gaps between them. Plaster, often reinforced with animal hair, was then spread over the laths and forced through the gaps in between. The ridges so formed are called “nibs” and these hold the ceiling together.

The more modern method of constructing a ceiling is to nail sheets of gypsum board to the joists and cover them with a thin skim coat of plaster.

Cracks are the most common form of damage found in a ceiling and if they are only fine they can be filled with a filler compound. However, if they are wide and cover a large area of the ceiling the structure will be dangerously weak and should be replaced.

If a plasterboard ceiling sags it is probably because the fixing nails have loosened. Refix the affected area by renailing with 2in drywall nails spaced 6in apart.

If plaster has fallen away from the laths but they appear to be in good condition, replaster them after cutting back the original plaster to make a regular shape and reach sound plaster. Undercut the edges of the plaster and make sure there is no old plaster left between the laths. Then treat the area with an adhesive.

When plastering always work across the laths, spreading on a thin coat of bonding plaster first and keying it with a scratch comb made by knocking a row of nails into the edge of a short batten. Apply another coat of bonding plaster and key this with a devilling float, pressing it down to allow for two thin finishing coats. Polish these when hard with a wetted steel trowel.

Cutting an External Doorway

Filed Under: Do it yourself, Remodeling    by: ITC

The positioning and installation of external doors is subject to the requirements of your local building code, so make the necessary applications to your local building department first.

Temporary support for the wall must be provided by Sin sq needles on top of adjustable metal props. To fit the needles, remove a whole brick from the outer layer and drill through the inner layer at the corners of the opening. Use the holes as a guide for cutting out the masonry from the inner layer. Insert the needles and tighten the props.

Draw the outline of the lintel on the inside wall and cut out the plaster and masonry from within. Drill the corners of the outer layer and remove the masonry. Fit the lintel on mortar bearings packed out with tiles or slates to set it level. Fill all round the inner portion of the lintel with mortar and rebuild any brickwork above it. Similarly rebuild the outer brickwork in the existing bond or stand the bricks on end to form a “sodier” arch.

When the mortar has set, remove the needles and brick up the holes. Then cut out the opening for the door frame — to fit the size of the frame.

Remove the bricks down to floor level, cutting through the protrud-bricks of the inner layer, on solid walls but removing whole bricks from the outer layer to give a toothed appearance. Square up the toothed outer layer by fitting cut bricks in place so that their “finished” ends are outermost.

Toe-nail the frame together before inserting it in the opening. Tack a length of flashing material to the underside of the sill, covering the nail heads with a bituminous sealant.

Fix the frame in the opening with screws and wallplugs, packing the sides to make them vertical. Fill gaps on the inside with mortar; apply caulking around the frame on the outside to keep out water.

The door sill should overhang the brickwork slightly and is best fitted with a metal weather bar, which is set in caulk. Once the frame is in place, hang the door and finish.