Replacing Skirting & Architraves

Filed Under: Do it yourself, Home repair, Redecorating, Remodeling    by: ITC

Standard features of all houses, however plain. Although each performs a specific job, they also provide ornamentation and a chance to vary decoration.

As the years pass, they’re bound to come in for a few knocks – and will most likely be covered in several layers of paint, which not only get chipped but also eventually clog up their profiles. Skirting boards, in particular, are also prone to rot if walls or floors are damp. However, since wood trim is in no way part of the house’s structure, repairs and even replacement should create no major problems.

Slight dents and cracks can often be repaired with cellulose filler – or perhaps glass fibre repair paste for larger or more accident-prone areas. In most cases you’ll have difficulty blending in the filler by hand with an ordinary filling knife. Instead, you can use a template cut to the profile of the molding from plastic sheet (a large plastic ice-cream container is ideal), or hardboard or cardboard; run it along to smooth the surface after applying the filler.

If the damage is more serious, you may be able to saw and/or chisel out the bad part to leave clean edges, and glue and pin in a small piece or pieces of prepared molding, or else plain timber shaped to fit.

If patching and filling won’t work, you need a completely new piece. This, however, can be a snag if your existing molding is one of the scores of obsolete types, because you won’t be able to match it off the shelf.

You may occasionally be able to buy something suitable – on site where an old house is being demolished or renovated, or perhaps from a demolition contractor who stocks secondhand timber. Otherwise, many joinery firms will cut a molding specially if you take in a sample of the pattern; but that’s likely to prove very expensive.

Your next option is to substitute a readily available pattern of molding throughout the room. But that’s a pity – not to say a lot of trouble – if most of it is sound. A third possibility, probably the most attractive if you only need a small piece, is to make it yourself. You can mold the shape with a power router, or perhaps a plough plane, combination plane or scratch stock.

A scratch stock consists of a piece of steel (for example part of a hacksaw blade) ground and/or filed to the profile you want. It is then clamped with screws between two pieces of hardwood in an improvised stock, and scraped along the timber till the desired shape emerges.

Externally curved moldings, such as plain chamfered skirting and architrave, can of course usually be formed with an ordinary bench plane and glasspaper. Lastly, it’s sometimes possible to make the molding up in sections from smaller ones, glued together and filled where necessary.

Simple Boxing in

Filed Under: Do it yourself, Home repair, Plumbing, Remodeling    by: ITC

For many people a simple boxing-in of their existing pipes to keep them out of sight is all that they require. This is a straightforward task and the materials are easily available.

You’ll need softwood battens, usually 50x25mm (2×1 in), with a cladding of hardboard or 3mm plywood for the simplest job. Before you go ahead. however. you should check whether any hot water passes through the pipes to be hidden.

If this is the case and you’re using hardboard for your cladding, you’ll have to condition it first Of it will warp as the heat in the pipework dries it out. This is riot a difficult technique: all youl have to do is brush water onto the reverse (mesh) side and leave it flat for 48 hours in the room where it is to be fixed. The softwood battens should also be left lying flat in the room for a few days so that they. too. w adjust to the moisture content of the air.

If the wood has been conditioned, the two battens should be screwed to the wall on each side of the pipes and the cladding attached to the battens.

Fixing battens edge-on to the wall is not always the perfect answer but by doing so you’ll be able to cover adequately a few pipes that project up to 25mm (1 in) or so from the wall, and the cladding will, in any case, hold the battens steady.

Remember that you should never use glue to fix the cladding to the battens because you might need access to the pipes for repairs or modification at some stage in the future. Pins punched in at 150mm (6in) centres, with their heads covered with filler, should prove adequate; this way the cladding can be prised off if necessary.

Boxing in pipes running in a corner will require two 25mm (1 in) battens which have been chamfered at the front to provide an angled edge. These are screwed to the two walls and the cladding, also with chamfered edges, is then fixed to the battens. For larger pipes you’ll need just a single larger batten fixed to one of the smaller ones; the cladding will be pinned to this and the smaller batten.

Another method is to use a spring clip attached to a piece of 19mm (s/ain) thick timber. Its edges should be planed and chamfered to allow it to fit neatly into the corner, and the spring clip is then fixed to the pipe itself.

If the pipes are in the alcove of a chimney breast you can box them in and then finish off the boxing so that it looks like an extension of the existing wall (see Ready Reference). The boxing for horizontal pipes down near the floor can often be made to look like wide and deep skirting.

A 25mm (1 in) batten should be fixed to the floor itself and one should also run above, but parallel to, the pipe. To the upper batten an additional 50x25mm (2×1 in) batten should be fixed; the cladding is then attached to this and the batten on the floor.

Constructing Archways

Filed Under: Do it yourself, Remodeling    by: ITC

One of the problems with taking out a wall between two rooms to make a through-room is that the beam and its supporting piers remain as clear evidence of what has been done. The same applies if you remove a door and frame from their opening to make an open plan access point between two rooms. These functional pieces of the structure can be disguised and made to look more decorative by forming them into curved archways.

There are many ways in which you can construct archways from scratch, using a basic framework of sawn wood clad with hardboard, plywood, drywall or imitation bricks, but probably the easiest is to use prefabricated galvanized steel mesh arch formers. These are fixed in place at the top of the opening and plastered to match the adjoining walls.

Mesh arch formers usually come in four pieces, each piece being half of the face of one side of the arch and half of the associated area of soffit. In this way they can be trimmed down to fit narrow walls, or widened by the addition of extra soffit strips. They are available in a variety of shapes and sizes for spans of up to 10ft. Some one-piece versions are also available.

The faces of the prefabricated mesh panels are usually extended at the edges to form mounting flanges which sit flat against the face of the wall. The formers are

secured by driving galvanized masonry nails through the flanges into the wall or by pushing the flanges into dabs of plaster.

If you intend to disguise a newly fitted beam with arch formers, they should be installed before you plaster either the beam or the piers. If you want to improve the look of an existing opening, you will have to cut – away a margin of plaster so that the mounting flanges of the formers will sit back flush against the wall.

Instead of using Bonding plaster for the floating coat, the mesh arch formers should be given a backing coat of Metal Lathing plaster. This hardens to leave a rough finish ready for the application of thin layers of Finish plaster. Rule the finish layer level with any surrounding original plaster.