Attics and Extensions

Filed Under: Do it yourself, Home repair, Remodeling    by: ITC

Being able to get into the roof space of your home is important, not just because of the extra storage capacity it offers but also to be able to deal with emergencies like leaking roofs and burst pipes. and also to be able to install extra light fittings to the rooms below.

Most houses already have some form of hatchway providing access to the attic but it may not always be in the most convenient place, and in some instances there may be no access to the attic at all. In both situations you can make a new opening with comparatively little trouble.

The usual position of an attic hatchway is in a hall or over a landing. but in the latter case make sure it is not over the staircase itself. Do not put it near an external wall either if this meets the eaves of the roof, as there will not be enough headroom above the opening.

Another important consideration when positioning an opening is the space needed in the roof and in the room below for any attic ladder you intend fitting.

Having decided on the approximate position. locate the adjacent joists by tapping the ceiling and probing with a bradawl. or mark through from the loft if you can reach it by some other route.

Break through the ceiling between a pair of joists and open up the hole until you can make a saw cut alongside one of them. Then mark out the opening on the ceiling from this baseline. Its size will be determined by the joist spacing and since this will be too close to make the opening between the pair, it will have to span three. This means cutting through the center joist and linking it to the joists on each side with short “trimmer” joists. The wood used must be the same size as that of the original joists.

Before you cut through the intermediate joists. support the ceiling on each side of the opening with stout planks and wood or adjustable metal props.

Line the opening with 1 in thick planed wood the same depth as the joists and nailed in place flush with the ceiling. The corners of this can be simply butted together.

Then make up a plywood trapdoor for the opening. hinging it to the bottom of the lining and either fitting a magnetic catch on the opposite side or an automatic catch such as that supplied with an attic ladder.

Finally, nail lengths of mitered molding around the opening, driving the nails into the joists so that the molding holds the edges of the ceiling firmly in place.

Cutting an External Doorway

Filed Under: Do it yourself, Remodeling    by: ITC

The positioning and installation of external doors is subject to the requirements of your local building code, so make the necessary applications to your local building department first.

Temporary support for the wall must be provided by Sin sq needles on top of adjustable metal props. To fit the needles, remove a whole brick from the outer layer and drill through the inner layer at the corners of the opening. Use the holes as a guide for cutting out the masonry from the inner layer. Insert the needles and tighten the props.

Draw the outline of the lintel on the inside wall and cut out the plaster and masonry from within. Drill the corners of the outer layer and remove the masonry. Fit the lintel on mortar bearings packed out with tiles or slates to set it level. Fill all round the inner portion of the lintel with mortar and rebuild any brickwork above it. Similarly rebuild the outer brickwork in the existing bond or stand the bricks on end to form a “sodier” arch.

When the mortar has set, remove the needles and brick up the holes. Then cut out the opening for the door frame — to fit the size of the frame.

Remove the bricks down to floor level, cutting through the protrud-bricks of the inner layer, on solid walls but removing whole bricks from the outer layer to give a toothed appearance. Square up the toothed outer layer by fitting cut bricks in place so that their “finished” ends are outermost.

Toe-nail the frame together before inserting it in the opening. Tack a length of flashing material to the underside of the sill, covering the nail heads with a bituminous sealant.

Fix the frame in the opening with screws and wallplugs, packing the sides to make them vertical. Fill gaps on the inside with mortar; apply caulking around the frame on the outside to keep out water.

The door sill should overhang the brickwork slightly and is best fitted with a metal weather bar, which is set in caulk. Once the frame is in place, hang the door and finish.

Making a New Doorway

Filed Under: Do it yourself, Remodeling    by: ITC

As with all jobs of this type, making a new doorway requires careful planning. You should also check the requirements of your local building code.

A lintel must be chosen to match the type of wall being cut into and you must select a position for the door that, if possible, will not interfere with existing cable and pipe runs and which should be at least 18in from any corner.

It is possible to buy doors and ready-made frames in a range of standard sizes, and unless you are making the frame, it is best to buy the door and frame first, making the opening to fit it. Make sure its height leaves enough of the wall above the opening for fitting the lintel and the temporary wood supports.

With a masonry wall, you must provide temporary support for the wall above the opening and the load it carries while you cut out a slot for the lintel. If the wall supports the joists of the ceiling above, you must also make sure you support the ceiling on both sides of the wall as well.

Support the wall with 6ft lengths of 2 x 4in wood called “needles” — on top of adjustable metal props, which work like an automobile jack (you can rent these), spaced at 3ft intervals. With a normal sized doorway, you would need only one set centrally above the opening.

To support the ceiling, lengths of 4 x 12in wood are used across the tops of more props. None of the props should be more than 2ft from the wall, and if they are to stand on a wood floor, the feet should be placed on another length of 2 x 4in wood to spread the load.

Before marking out the doorway on the wall, use a bricklayer’s chisel and hammer to remove patches of plaster roughly where the edges and top of the opening will be. This will allow you to adjust fairly accurately the position of the opening to coincide with the mortar joints, in order to reduce the number of bricks you have to cut through.

Measure up the door frame, adding 2in to its width and lin to its height to allow for positioning. Using these dimensions, draw an outline of the opening on the wall. Then measure up the lintel — which should be at least l ft wider than the opening — and add a further 2in to its width for fitting. Draw the outline of the lintel on the wall above the door opening.

Finally, draw the outline of the wood needle centrally above the needle outline. Repeat the outlines on the other side of the wall.

Cut the hole for the needle with a hammer and bricklayer’s chisel. Slide the needle through so it protrudes equally on both sides of the wall and fit the props beneath it, tightening them to take the load. Both props must be adjusted simultaneously to ensure even support. Then fit the ceiling supports.