Fitting the new taps

Filed Under: Bathroom, Do it yourself, Home repair, Kitchen, Plumbing, Remodeling    by: ITC

When fitting the new taps or mixer, unscrew the back-nuts, press some plumber’s putt round the tail directly below the tap body a fit a plastic washer onto the top.

Push the tails through the holes in the base. Slip flat plastic washers over the tails where they protrude from beneath the basin. screw on the back-nuts and tighten them up. Make sure that the taps or mixer are secure, but don’t overtighten them. To make tightening easier, (and undoing, if ever necessary) use top-hat washers.

All that remains to be done is to conned the swivel tap connectors to the tails of the new taps or mixer. You will see that a tap connector consists of a lining — with a flange — that is inserted into the tap tail and is then secured by the coupling nut. This nut provided with a washer to ensure a watertight connection. When renewing taps you may well need to renew this small washer.

It is possible that when you come to connect the water supply pipes to the taps you will get an unpleasant surprise. The tails of modern taps are slightly shorter than those of older ones and the tap connectors may not reach. If the water supply pipes are of lead or of copper it is quite likely that they will have enough ‘give’ to enable you to make the connection but, if not, there are extension pieces specially made to bridge the gap.

If you’re replacing existing bib taps with those of a more modern design. it’s a relatively simple matter of disconnecting and unscrewing the old ones and fitting the new taps in their place. However, it’s quite possible that you’ll want to remove the bib taps altogether and fit a new sink with some pillar taps. This will involve a little more plumbing work. To start with, turn off the water supply and remove the taps and old sink.

If the pipework comes up from the floor, you’ll need to uncover the run in the wall to below where the new sink will go. You should then be able to ease the pipes away from the wall and cut off the exposed sections. This will allow you to join short lengths of new pipe, bent slightly “if necessary, to link the pipe ends and the tap tails.

Alternatively. if the pipes come down the wall you’ll have to extend the run to be,row the level of the new sink and use elbow fittings to link the pipe to the tap tails. In either case it’s a good idea to fit the taps to the new sink first and to make up the pipe- work runs slightly overlong, so that when the new sink is offered up to the wall you can measure up accurately and avoid the risk of. cutting off too much pipe.

Rather than having to make difficult bends you can use lengths of corrugated copper pipe. One end of the pipe is plain so that it can be fitted to the 15mm supply pipes with either a soldered capillary or compression fitting: the other end has a swivel tap connector.

Getting a Building Permit

Filed Under: Do it yourself, Electrical, Home repair, Plumbing, Services    by: ITC

A building permit will probably be required if you plan to do the following:

1. Alter or change the external appearance of your house. For example if you: add a porch; add a screen in a porch; add or remove a window or door, or if you build a fence or wall.

2. Do any electrical work.

3. Do any plumbing work.

4. Add or remove any structural element.

5. Build an addition to your house.

6. Erect a separate building on your property.

Applying for a building permit

To obtain a building permit, a set of plans showing your proposed alterations must be submitted to the local Building Department where they will be checked for compliance with the National and local Building Code. If the plans are up to code a permit will be issued, usually for a small fee.

The permit will be valid for one year after which time a new application must be made if the work has not started. The permit must be displayed prominently at various stages of the construction work you may be required to call in the local building inspector to check the work for compliance, for instance, before and after any footings have been made.

This checking procedure ensures that the work is indeed being carried out according to the approved plans and that the method of construction and the quality of the materials is up to the standard set out in the Building Code. Although this procedure may not be necessary on your particular job, however, the Building Inspector may call by at any time to check on the progress of the work.

Always be sure to complete the job according to the approved plans. If you are in any doubt, call the building inspector and ask his advice, never try to guess. This could be a waste of your time and money as any work not covered by the approved plans or not up to the standards of the code may be condemned at any stage of the building.

If your plans are rejected by the building department for non-compliance you will receive a notification of the reasons given. In some cases this may be simply dealt with by getting your building contractor to amend the plans making sure all the changes are incorporated before re-submitting them.

In other cases the layout of your property may make it impossible to comply with the requirements of the code. In this case you may seek an exception to the law by filing an application with the Zoning Board of Review. When filing for an exemption, evidence supporting your position must be presented with your application, together with a block plan showing all lots within a specified distance including all buildings and marked with owners’ names and addresses.

A plan of your lot showing the existing structures, and plans and elevations of the proposed work must also be submitted. A decision will be made after a public meeting of the Board during which any member of the public may speak for or against the project.